Tri-Cities whole-system map
Confirm the Scope Before Planning a Repipe
Begin with what can be observed safely, then map fixtures, branches, shutoffs, access openings and finish restoration. Pipe colour alone is not confirmation, and a complete proposal must address more than replacement piping.
- 01Safe identification
Record Markings and Locations Without Opening Walls
Record visible pipe markings, locations and fittings safely while respecting colour limitations and professional confirmation.
- 02Whole-system map
Map Every Branch, Fixture and Access Point
Define whole-home repipe routes, shutoffs, fixtures, access, material evidence, testing, insulation and closeout.
- 03Access & restoration
Define Openings, Protection and Finish Repair
Plan repipe access assumptions, protection, opening ownership, material checks, drywall, texture, paint, cabinets and finish records.
- 04Strata file
Clarify Unit, Common-Property and Shutdown Responsibilities
Organize Poly-B strata records, ownership questions, risers, branches, shutdowns, access, insurance, restoration and decisions.
- 05Document register
Verify Requirements with the Right Parties
Resolve municipal plumbing routes, inspection records, insurer questions, photos, invoices and retention for a Tri-Cities repipe.
- 06Proposal matrix
Compare Pipe Scope, Access and Restoration
Compare repipe proposals by system completeness, materials, access, restoration, permits, testing, protection, shutdowns, changes and closeout.
Resolve the municipality before using a permit route
Coquitlam, Port Coquitlam and Port Moody have separate authority processes. The linked page applies to Port Coquitlam only; use the property address to find and confirm the correct municipal route.